Post EIA Monitoring for D28 FDO project (2019)

Petronas Carigali Sdn Bhd installed a Light Weight Structure platform (D28D-A) and a 8 km pipeline at D28 Field, located 90km NW of Bintulu, offshore Sarawak, in a water depth of 35m (115 ft) and this project assesses impacts of this development after one year. Preliminary hydrographic surveys indicated there may be coral outcrops present…

Details

Rapong Exploration Drilling Campaign at Block A, Offshore Brunei Darussalam (2015-Aug 2016)

MRF was contracted by Chemsain (B) Sdn Bhd to provide marine inspection and video expertise for the Environmental Baseline Study for the Rapong Exploration Drilling Campaign at Block A, Offshore Brunei Darussalam commissioned by Shell Deepwater Borneo. Sea floor characteristics and marine organisms inhabiting these areas were assessed by conducting 15-30 minute investigational dives using a…

Details

Block N EBS, Brunei (2015)

The Block N (Brunei) project used a Remote Operated Vehicle (ROV) and sidescan on behalf of support of the Petronas Carigali Brunei Limited Block N Exploration Drilling Campaign. The project entailed the use of a dual channel, high resolution, sidescan sonar linked to GPS data feed with setback adjustment, using the speed over ground to…

Details

Block N EBS, Sabah, Malaysia (2015)

This desktop review project was undertaken by MRF on behalf of Chemsain Konsultant Sdn Bhd for the Block N Deepwater Exploration Campaign commissioned by Total Exploration & Production Malaysia. The project was carried out in support of a desktop Environmental and Social Impact Assessment (ESIA), prior to seismic surveys. MRF was contracted to review, update…

Details

Manabi Port Project, Brazil (2014-2015)

MRF was contracted by Manabi S.A., the Proponent of the North Port in Linhares in the State of Espírito Santo, Brazil, to review the proposed Port development objectives, comment on the likelihood and potential impacts of the North Port development on sea turtles in the State of Espíritu Santo, and in the longer term to…

Details

Kebabangan – ERB West Pipeline, Sabah, Malaysia (2014-2015)

The marine benthos inspection component of a Biodiversity Impact Assessment was undertaken by MRF on behalf of Chemsain Konsultant Sdn Bhd for the Kebabangan – ERB West Pipeline Project commissioned by Petronas Carigali Sdn Bhd. MRF’s scope of work included conducting a qualitative survey on the coral reefs along the proposed pipeline corridor; identifying potential…

Details

INPEX Exploration Drilling Campaign, Sabah, Malaysia (2014)

A desktop review project was undertaken by MRF on behalf of Chemsain Konsultant Sdn Bhd for the Environmental Risk Assessment (ERA) Study for Exploration Drilling off northwest Sabah commissioned by INPEX Offshore North West Sabah Ltd. INPEX Corporation, through its subsidiary INPEX Offshore North West Sabah Ltd. proposed to conduct exploration activities on Blocks S…

Details

ASB Wharf EBS, Labuan, Malaysia (2013-2014)

ASB Labuan Sdn Bhd appointed Chemsain Konsultant Sdn Bhd to undertake the Environmental Impact Assessment study, and MRF was appointed to carry out the marine component of the EIA for the Proposed New Quay Wharf at Asian Supply Base Sdn Bhd, Labuan The project involved developing a new wharf adjacent to the existing ASB wharf…

Details