300MW Combined Cycle Gas-Fired Power Plant Project at POIC Lahad Datu, Sabah, Malaysia (2012)

The marine ecology component of the Environmental Impact Assessment was undertaken by MRF on behalf of Chemsain Konsultant Sdn Bhd for the 300MW Combined Cycle Gas-Fired Power Plant Project commissioned by Eastern Sabah Power Consortium Sdn Bhd. The proposed Project comprised the installation of a 300MW net combined cycle dual-fuel (natural gas as main fuel/distillate…

Details

Barzan Marine Environmental Survey, State of Qatar (2008)

This project comprised underwater video surveys to determine the composition of benthic faunal assemblages, seafloor habitat mapping, sediment classification boundary delineation and groundtruthing, and mapping on belanf of URS Qatar LLC, which was contracted by RasGas Company Limited to conduct an Environmental, Socio-economic and Health Impact Assessment for the Barzan Projec. This project was designed…

Details

Block N EBS, Brunei (2015)

The Block N (Brunei) project used a Remote Operated Vehicle (ROV) and sidescan on behalf of support of the Petronas Carigali Brunei Limited Block N Exploration Drilling Campaign. The project entailed the use of a dual channel, high resolution, sidescan sonar linked to GPS data feed with setback adjustment, using the speed over ground to…

Details

Block N EBS, Sabah, Malaysia (2015)

This desktop review project was undertaken by MRF on behalf of Chemsain Konsultant Sdn Bhd for the Block N Deepwater Exploration Campaign commissioned by Total Exploration & Production Malaysia. The project was carried out in support of a desktop Environmental and Social Impact Assessment (ESIA), prior to seismic surveys. MRF was contracted to review, update…

Details